Home ProductsBSPT Pipe Fittings

55 Degree Cone Union BSPT Pipe Fittings , Male Thread Hydraulic Hose Adapters

Certification
China YUYAO DUOLI HYDRAULICS CO.,LTD. certification
I'm Online Chat Now

55 Degree Cone Union BSPT Pipe Fittings , Male Thread Hydraulic Hose Adapters

55 Degree Cone Union BSPT Pipe Fittings , Male Thread Hydraulic Hose Adapters
55 Degree Cone Union BSPT Pipe Fittings , Male Thread Hydraulic Hose Adapters

Large Image :  55 Degree Cone Union BSPT Pipe Fittings , Male Thread Hydraulic Hose Adapters

Product Details:
Place of Origin: Zhejiang, China (Mainland)
Brand Name: DUOLI
Model Number: ADAA(1T)
Payment & Shipping Terms:
Minimum Order Quantity: 500pieces
Price: Negotiable
Packaging Details: standard exporting package or as per customers' requests.
Delivery Time: within 30 days or as per customers' requirement.
Payment Terms: T/T
Supply Ability: 3000pieces/month

55 Degree Cone Union BSPT Pipe Fittings , Male Thread Hydraulic Hose Adapters

Description
Material: Carbon Steel Color: White
Technics: Casting Type: Nipple, Brass Male Thread Nipple
Model Number: 1T Brand Name: DUOLI
High Light:

bspt adapter

,

bspt thread adapters

55 Degree Cone Union BSPT Male Adapter (1T) Pipe Fitting

 

Thread eccentricity tolerance:

 

2A of the external thread and the thread of the modified 2B various elements, the concentricity of the joint

 

does not exceed the following limit

 

External thread

 

When the diameter is the largest and the largest diameter, the two thread elements must be concentric,

 

however, if the size is not round, the size is small, in the non round point, the diameter and diameter will

 

produce deviation

 

In the middle of the smallest, the largest diameter, the two elements of the total runout can not be greater

 

than the middle diameter tolerance;

 

The diameter of the largest, the largest diameter of the hour, the two elements of the eccentricity of the

 

full jump is not greater than the large diameter tolerance;

 

The diameter of the smallest, the largest diameter of the hour, the two elements of the total runout can

 

not be greater than the diameter of the tolerance tolerance

 

Internal thread

 

The smallest diameter, small diameter (minor diameter) the shortest, the two should be concentric, if the

 

path is not round or too large, the two elements of the total runout can not be greater than the size of the

 

path tolerance;

 

The maximum diameter of the path, the shortest path, the two elements of the eccentricity of the total

 

runout should not be greater than the median diameter tolerance

 

When the diameter is the smallest, and the path is the largest, the full runout of the two elements can not

 

be greater than the path.

 

             Thread WINNER PART NO.
PART NO. 1 2
ADAA-02-02 R1/8"×28 R1/8"×28 1T-02SP
ADAA-02-04 R1/8"×28 R1/4"×19 1T-02-04SP
ADAA-02-06 R1/8"×28 R3/8"×19 1T-02-06SP
ADAA-04-04 R1/4"×19 R1/4"×19 1T-04SP
ADAA-04-06 R1/4"×19 R3/8"×19 1T-04-06SP
ADAA-04-08 R1/4"×19 R1/2"×14 1T-04-08SP
ADAA-06-06 R3/8"×19 R3/8"×19 1T-06SP
ADAA-06-08 R3/8"×19 R1/2"×14 1T-06-08SP
ADAA-08-08 R1/2"×14 R1/2"×14 1T-08SP
ADAA-08-10 R1/2"×14 R5/8"×14 1T-08-10SP
ADAA-10-10 R5/8"×14 R5/8"×14 1T-10SP
ADAA-08-12 R1/2"×14 R3/4"×14 1T-08-12SP
ADAA-10-12 R5/8"×14 R3/4"×14 1T-10-12SP
ADAA-12-12 R3/4"×14 R3/4"×14 1T-12SP
ADAA-12-16 R3/4"×14 R1"×11 1T-12-16SP
ADAA-16-16 R1"×11 R1"×11 1T-16SP
ADAA-16-20 R1"×11 R1.1/4"×11 1T-16-20SP
ADAA-20-20 R1.1/4"×11 R1.1/4"×11 1T-20SP
ADAA-20-24 R1.1/4"×11 R1.1/2"×11 1T-20-24SP
ADAA-24-24 R1.1/2"×11 R1.1/2"×11 1T-24SP
ADAA-24-32 R1.1/2"×11 R2"×11 1T-24-32SP
ADAA-32-32 R2"×11 R2"×11 1T-32SP

 

Our QC procedure:


As we had more than 5 professional and technical personal, they ensure 100% products checking.


1. Material checking: strictly control of material using, meet international requested standards;


2. semi-finished products inspection: product inspection before 100% finished ;


3. production line test: with work team or data engineer who will inspect matchines and lines at fixed

period.


4. finished prodcuct inspection: quality and property test before products are plated zinc, packed and loaded.


Shipping & Service:


1. Orders will be dispatched around in 30 days after payment, depending on quantities.


2. We Always choose the most economical and reliable shipping company to make sure you receive the goods in time.


3. The tracking number will be provided to you once the consignment is shipped


4. Professional customer service to answer your questions or fix problems regarding your order.

Contact Details
YUYAO DUOLI HYDRAULICS CO.,LTD.

Contact Person: Duoli

Tel: +8613586832949

Send your inquiry directly to us (0 / 3000)